-->

Tuesday, June 26, 2018

South Brooklyn Marine Terminal Rail Extension Project - YouTube
src: i.ytimg.com

The South Brooklyn Marine Terminal (SMBT) is an intermodal shipping, warehousing, and manufacturing complex on in the Port of New York and New Jersey. It is located the Upper New York Bay in the Sunset Park neighborhood of Brooklyn adjacent to Industry City, which lies directly to the south. A recycling and waste transfer facility managed by Sims Metal Management is the major tenant. An auto processing terminal is proposed.


Video South Brooklyn Marine Terminal



Early ferry service

The New York and South Brooklyn Ferry operated a ferry from the Battery Maritime Building (formerly known as Municipal Ferry Pier) to the South Brooklyn 39th Street Ferry Terminal, where rail transfer (to the South Brooklyn Railway) was possible until 1935.


Maps South Brooklyn Marine Terminal



Rail service

Adjacent to the Bush Terminal it is served by car float and transloading activities of New York New Jersey Rail via the 65th Street Yard which also connects to the Bay Ridge Branch, operated by the New York Connecting Railroad. Rail infrastructure improvements along 1st Avenue completed in 2012 connected the yard to SBMT. Other investments in infrastructure included a new break-bulk rail spur along the 39th Street shed, two new rail sidings for auto rack transloading, and a new rail connection to the SIMS facility at the 29th Street Pier. SBMT is also connected along the South Brooklyn Railway (ROW) to 36th-38th Street Yard. In 2012, the interchange with New York New Jersey Rail, LLC at Second Avenue was refurbished and a new ramp was installed at the 38th Street Yard at Fourth Avenue to allow receipt of new R156 locomotives and other subway rolling stock that are delivered on flat cars.


A Tour Of The South Brooklyn Marine Terminal - BKLYNER
src: s3.amazonaws.com


Waste management

Sims Metal Management subsidiary Sims Municipal Recycling (SMR) managed construction of a new 11-acre recycling center at SBMT from 2010 to 2013. SMR worked with geotechnical engineers to develop structural fill blends using "mole rock" from NYC tunneling projects mixed with recycled glass aggregate (RGA). More than 5,000 tons of RGA were blended with 20,000 tons of mole rock and used to elevate sections of the site by 4 feet, thereby protecting buildings and equipment against sea level rise and storm surges.


South Brooklyn Marine Terminal Dredging | Jay Cashman
src: www.jaycashman.com


Wind turbine

In January 2015, SIMS inaugurated the city's only commercial-scale wind turbine at the recycling center. Built by Northern Power Systems at the cost of about $750,000, the 160 ft (49 m) tall turbine has the capacity to produce 100 kilowatts, or 4% of the center's power needs.


File:South Brooklyn Marine Terminal wind turbine as seen from near ...
src: upload.wikimedia.org


Auto processing

Auto processing, the customization of imported automobiles, is done at the terminal at a scaled-down assembly plant where much of the work is done by hand using simple tools. Quality control inspections are done, repairs are made, and accessories - such as floor mats, GPS systems, satellite radios, alloy wheels and roof racks - are installed. The facility at SBMT was operated by the Axis Group. which filed bankruptcy in 2012. Plans by the New York City Economic Development Corporation (NYCEDC) to redevelop and expand the auto processing have been bogged down since 2014.


Red Hook Terminals
src: redhookterminals.com


See also

  • Red Hook Container Terminal
  • Rail freight transportation in New York City and Long Island
  • Tugboats in New York City
  • Vision 2020: New York City Comprehensive Waterfront Plan
  • List of ports in the United States
  • List of North American ports

Developers Compete to Shape the Future of Brooklyn's Sunset Park ...
src: cdn1.vox-cdn.com


References

Source of article : Wikipedia